Skill-Verzeichnis

Wiederverwendbare Skills für AI Agents entdecken.

Durchsuche reale GitHub-Skills nach Aufgabe und prüfe Stars, Trust, Audit, Kategorie und Installationspfad vor der Verwendung.

Jede Empfehlung bleibt mit ihrem Repository, Audit und Installationspfad nachvollziehbar.

Suchergebnisse: critical-path-method

Englisches Verzeichnis

Reverse-lookup glossary that turns a vague description of a web animation or motion effect into its exact term ("the bouncy thing when a popover opens" → Pop in; "the iOS rubber-band scroll" → Rubber-banding). Use when the user asks "what's it called when…", or describes a motion effect without knowing its name and wants the right word to prompt an AI or designer with. For naming an effect, not designing or building one.

17K
Stars
87/100
Trust
Kategorie: design-creativeAudit

React and Next.js performance guidance for writing, reviewing, and refactoring production UI code.

30K
Stars
88/100
Trust
Kategorie: coding-agentsAudit
Cli75

A versatile command-line tool for interacting with Google Workspace APIs, designed for both human users and AI agents.

30K
Stars
75/100
Trust
Kategorie: utilityAudit

Distributed reliable key-value store for the most critical data of a distributed system

52K
Stars
86/100
Trust
Kategorie: devopsAudit

Event Driven Orchestration & Scheduling Platform for Mission Critical Applications

27K
Stars
87/100
Trust
Kategorie: agent-frameworksAudit

Apple's approach to interface design and fluid, physical motion, translated for the web. Use when building or reviewing gesture-driven UI, spring animations, drag/swipe/sheet interactions, momentum and interruptible transitions, translucent materials and depth, typography (optical sizing, tracking, leading), reduced-motion, or the design foundations (feedback, spatial consistency, restraint) behind Apple-style interfaces.

18K
Stars
87/100
Trust
Kategorie: design-creativeAudit

Reviews animation and motion code against a high craft bar derived from Emil Kowalski's design engineering philosophy. Default to flagging; approval is earned.

18K
Stars
87/100
Trust
Kategorie: design-creativeAudit

This skill encodes Emil Kowalski's philosophy on UI polish, component design, animation decisions, and the invisible details that make software feel great.

13K
Stars
87/100
Trust
Kategorie: design-creativeAudit

YugabyteDB - the cloud native distributed SQL database for mission-critical applications.

10K
Stars
77/100
Trust
Kategorie: devopsAudit

28 eval-informed mental models and critical-thinking skills for Claude Code, GitHub Copilot, Codex, Cursor, and other Agent Skills-compatible tools

941
Stars
84/100
Trust
Kategorie: utilityAudit

Vendor-agnostic orchestration for training, inference and agentic workloads across NVIDIA, AMD, TPU, and Tenstorrent on clouds, Kubernetes, and bare metal.

2.2K
Stars
85/100
Trust
Kategorie: agent-skillsAudit