Skill ディレクトリ

AI Agent のための再利用可能な Skill を見つける。

タスクで実際の GitHub Skill を検索し、利用前に Stars、Trust、監査、カテゴリ、インストール経路を確認できます。

すべての推奨は、リポジトリ、監査、インストール経路に明確につながっています。

検索結果: critical-path-method

英語版ディレクトリ

Reverse-lookup glossary that turns a vague description of a web animation or motion effect into its exact term ("the bouncy thing when a popover opens" → Pop in; "the iOS rubber-band scroll" → Rubber-banding). Use when the user asks "what's it called when…", or describes a motion effect without knowing its name and wants the right word to prompt an AI or designer with. For naming an effect, not designing or building one.

17K
Stars
87/100
信頼
カテゴリ: design-creative監査

React and Next.js performance guidance for writing, reviewing, and refactoring production UI code.

30K
Stars
88/100
信頼
カテゴリ: coding-agents監査
Cli75

A versatile command-line tool for interacting with Google Workspace APIs, designed for both human users and AI agents.

30K
Stars
75/100
信頼
カテゴリ: utility監査

Distributed reliable key-value store for the most critical data of a distributed system

52K
Stars
86/100
信頼
カテゴリ: devops監査

Event Driven Orchestration & Scheduling Platform for Mission Critical Applications

27K
Stars
87/100
信頼
カテゴリ: agent-frameworks監査

Apple's approach to interface design and fluid, physical motion, translated for the web. Use when building or reviewing gesture-driven UI, spring animations, drag/swipe/sheet interactions, momentum and interruptible transitions, translucent materials and depth, typography (optical sizing, tracking, leading), reduced-motion, or the design foundations (feedback, spatial consistency, restraint) behind Apple-style interfaces.

18K
Stars
87/100
信頼
カテゴリ: design-creative監査

Reviews animation and motion code against a high craft bar derived from Emil Kowalski's design engineering philosophy. Default to flagging; approval is earned.

18K
Stars
87/100
信頼
カテゴリ: design-creative監査

This skill encodes Emil Kowalski's philosophy on UI polish, component design, animation decisions, and the invisible details that make software feel great.

13K
Stars
87/100
信頼
カテゴリ: design-creative監査

YugabyteDB - the cloud native distributed SQL database for mission-critical applications.

10K
Stars
77/100
信頼
カテゴリ: devops監査

28 eval-informed mental models and critical-thinking skills for Claude Code, GitHub Copilot, Codex, Cursor, and other Agent Skills-compatible tools

941
Stars
84/100
信頼
カテゴリ: utility監査

Vendor-agnostic orchestration for training, inference and agentic workloads across NVIDIA, AMD, TPU, and Tenstorrent on clouds, Kubernetes, and bare metal.

2.2K
Stars
85/100
信頼
カテゴリ: agent-skills監査