Annuaire de skills

Découvrez des skills réutilisables pour les AI agents.

Recherchez de vrais skills GitHub par tâche et vérifiez Stars, confiance, audit, catégorie et chemin d’installation avant de les utiliser.

Chaque recommandation reste clairement reliée à son dépôt, son audit et son chemin d’installation.

Résultats de recherche: critical-path-method

Annuaire en anglais

Reverse-lookup glossary that turns a vague description of a web animation or motion effect into its exact term ("the bouncy thing when a popover opens" → Pop in; "the iOS rubber-band scroll" → Rubber-banding). Use when the user asks "what's it called when…", or describes a motion effect without knowing its name and wants the right word to prompt an AI or designer with. For naming an effect, not designing or building one.

17K
Stars
87/100
Confiance
Catégorie: design-creativeAudit

React and Next.js performance guidance for writing, reviewing, and refactoring production UI code.

30K
Stars
88/100
Confiance
Catégorie: coding-agentsAudit
Cli75

A versatile command-line tool for interacting with Google Workspace APIs, designed for both human users and AI agents.

30K
Stars
75/100
Confiance
Catégorie: utilityAudit

Cognee is the open-source AI memory platform for agents. Give your AI agents persistent long-term memory across sessions with a self-hosted knowledge graph engine.

30K
Stars
87/100
Confiance
Catégorie: rag-knowledgeAudit

Distributed reliable key-value store for the most critical data of a distributed system

52K
Stars
86/100
Confiance
Catégorie: devopsAudit

Event Driven Orchestration & Scheduling Platform for Mission Critical Applications

27K
Stars
87/100
Confiance
Catégorie: agent-frameworksAudit

Apple's approach to interface design and fluid, physical motion, translated for the web. Use when building or reviewing gesture-driven UI, spring animations, drag/swipe/sheet interactions, momentum and interruptible transitions, translucent materials and depth, typography (optical sizing, tracking, leading), reduced-motion, or the design foundations (feedback, spatial consistency, restraint) behind Apple-style interfaces.

18K
Stars
87/100
Confiance
Catégorie: design-creativeAudit

Reviews animation and motion code against a high craft bar derived from Emil Kowalski's design engineering philosophy. Default to flagging; approval is earned.

18K
Stars
87/100
Confiance
Catégorie: design-creativeAudit

This skill encodes Emil Kowalski's philosophy on UI polish, component design, animation decisions, and the invisible details that make software feel great.

13K
Stars
87/100
Confiance
Catégorie: design-creativeAudit

YugabyteDB - the cloud native distributed SQL database for mission-critical applications.

10K
Stars
77/100
Confiance
Catégorie: devopsAudit

28 eval-informed mental models and critical-thinking skills for Claude Code, GitHub Copilot, Codex, Cursor, and other Agent Skills-compatible tools

941
Stars
84/100
Confiance
Catégorie: utilityAudit