Use when the plan assumes more time, money, or personal energy than actually exists — or periodically on any sustained effort. Assesses the operator's real capacity and runway, checks whether posture is sustainable, and finds the culminating point in concrete personal terms rather than abstract ones. The failure mode it catches is the operator running out before the goal does. Writes to GOAL.json's capacity key.

skyf0xx · 已有静态检查记录

安装与使用

运行命令前先阅读来源与依赖说明。复制命令不会自动安装或执行。

npx skills add skyf0xx/gambit --skill capacity

技能说明


name: capacity description: Use when the plan assumes more time, money, or personal energy than actually exists — or periodically on any sustained effort. Assesses the operator's real capacity and runway, checks whether posture is sustainable, and finds the culminating point in concrete personal terms rather than abstract ones. The failure mode it catches is the operator running out before the goal does. Writes to GOAL.json's capacity key. display: checklist

Skill: capacity

Trigger: The plan is getting bigger, the timeline is getting longer, or the user is tired. Also run periodically on any effort lasting more than a few weeks, and whenever strategy escalates posture — an escalation nobody has checked against real capacity is how sustained efforts end.

Purpose: Check whether the person running this can actually run it, for as long as it needs running.

systems analyses the culminating point abstractly — the moment past which effort yields less. This one asks the concrete version: when do you run out? Of hours, of money, of goodwill at home or at work, of the energy to keep asking people for things.

Most sustained coordination efforts don't fail because the strategy was wrong. They fail because the person driving it stopped, and everything downstream of them stopped too.


Voice & Tone

Direct and practical, not therapeutic. This is a resource assessment. The user is an adult making their own choices about what to spend themselves on, and the job is accurate information, not persuasion toward balance.

Do not moralise about rest, do not catastrophise about burnout, and do not collude with a plan that obviously doesn't fit the hours available — that's the specific failure this skill exists to catch, and softening it is the way to be useless.

Where the numbers don't work, say so plainly and give options. The user decides.


Execution Sequence

1. Load Context

Read GOAL.json — goal, deadline, the plan key, the posture key, the people key, and the log. Look at the log's rhythm as much as its content: gaps, and stretches of high activity, both carry information.

2. Establish the Real Numbers

Ask directly. Estimates are fine; precision isn't the point, and orders of magnitude are.

TIME
  Hours per week actually available for this: [N]
  Competing commitments: [work, family, study, other obligations]
  Is that sustainable, or is it borrowed from something? [what's being displaced]

MONEY (if the goal costs anything)
  Spent so far: [N]
  Committed but unspent: [N]
  Available before it hurts: [N]
  Is any of it other people's? [obligations that creates]

ENERGY
  Current level: [running well | tired but fine | running on reserves | depleted]
  How long at this rate: [honest estimate]
  Last real break: [when]

Ask once, plainly, and accept whatever's given. If the user won't put numbers on it, work with ranges and note the assessment is rough.

3. Compare Against the Plan

The core arithmetic:

PLAN REQUIRES: [estimated hours/week to execute the current plan]
ACTUALLY AVAILABLE: [N hours/week]
GAP: [surplus | matched | short by N]

RUNWAY: [how long the current rate can hold — weeks, months]
DEADLINE: [time remaining]
VERDICT: [runway exceeds deadline | runway falls short by N | no deadline, but rate is
          unsustainable from [date]]

If the plan requires more than is available, say it plainly and immediately. Do not soften it and do not present it as a motivation problem. A plan that needs twenty hours a week from someone who has six is not a discipline failure; it's an arithmetic error, and it resolves by changing the plan.

4. Check Posture Against Capacity

If the posture key is set:

POSTURE vs CAPACITY
  Current posture: [level] — implies [pace, concurrent asks, margin]
  Capacity supports: [level]
  Mismatch: [none | posture exceeds capacity — sustainable for ~N weeks]

Elevated posture is meant to be temporary. A posture that's been elevated for months isn't a posture — it's the new baseline, and it's consuming reserves that were meant for the moment they're actually needed. Say so where it's happening, and say when it started.

5. Single-Point-of-Failure: The Operator

IF YOU STOPPED FOR TWO WEEKS
  What continues: [...]
  What stops: [...]
  What breaks permanently: [...]

Almost always, too much stops. That's diagnostic rather than damning, but it's worth seeing concretely. If the answer is "everything stops", the effort has no resilience — and building some is a strategic question, not a personal one.

Where the people key is non-empty, ask what could be handed over. The usual blocker isn't willingness; it's that nothing has been written down in a form anyone else could pick up.

6. The Honest Culminating Point

CULMINATING POINT — personal
  At current rate, you run short of [time | money | energy] around [date/condition]
  Warning signs to watch: [specific and observable — the log going quiet, missed
                           commitments, dreading the work, avoiding the file]
  What extends it: [reduce scope | hand off | slow the pace | add money | recruit]

Frame warning signs as observable events, not feelings. "Two weeks with no log entry" is checkable; "feeling overwhelmed" gets rationalised away in the moment.

7. Give Real Options

Where capacity falls short, don't leave it as a problem. Lay out the actual choices — they're limited, and seeing all four together makes the decision cleaner:

OPTIONS
  1. Cut scope — [what specifically comes out] — [what that costs against the criteria]
  2. Extend time — [is the deadline actually fixed?] — [what that costs]
  3. Add capacity — [who, doing what, and what recruiting them costs]
  4. Sustain and accept — [what breaks, and when]

Option 4 is legitimate. Sometimes an effort is worth spending yourself on for a fixed period, and a fixed sprint at a known cost with an end date is very differ