跳至正文
OpenAgentSkill
浏览已开放 · 目录记录日期 2026-11-21 · 自动更新和账户服务暂时关闭。
其他技能

think-fermi-estimation

Produces a Fermi decomposition worksheet that estimates an unknown numeric quantity by factoring it into a chain of order-of-magnitude sub-estimates, guessing each to within a band, then multiplying back to a point estimate plus a compounded low/high range, with an independence check and a dominant-uncertainty flag. Use when you need a number and no lookup-able data or genuine reference class exists, so the magnitude has to be built from factors (for example sizing a market, a load, a cost, or a conversion you cannot look up). Not for forecasting from real base rates (use reference-class-forecasting) or decomposing a question for coverage with no number (use issue-tree).

product-on-purpose · 已有静态检查记录

安装与使用

运行命令前先阅读来源与依赖说明。复制命令不会自动安装或执行。

npx skills add product-on-purpose/thinking-framework-skills --skill think-fermi-estimation

技能说明


name: think-fermi-estimation description: Produces a Fermi decomposition worksheet that estimates an unknown numeric quantity by factoring it into a chain of order-of-magnitude sub-estimates, guessing each to within a band, then multiplying back to a point estimate plus a compounded low/high range, with an independence check and a dominant-uncertainty flag. Use when you need a number and no lookup-able data or genuine reference class exists, so the magnitude has to be built from factors (for example sizing a market, a load, a cost, or a conversion you cannot look up). Not for forecasting from real base rates (use reference-class-forecasting) or decomposing a question for coverage with no number (use issue-tree). license: Apache-2.0 metadata: id: thinking-framework-skills.fermi-estimation family: decision-and-option-evaluation evidence-tier: "M/P" version: 0.1.0 standard: "0.8"

Fermi Estimation

Sometimes you need a number and there is nothing to look up: no dataset, no genuine reference class, no precedent to borrow. A single all-at-once guess at the whole magnitude is badly anchored and hides its own uncertainty. The Fermi move is to factor the unknown into a short chain of sub-quantities - each one small and familiar enough to guess to within a factor - then multiply the chain back into an estimate and compound the per-factor bands into a low/high range. The reason it can beat one wild guess is partial error cancellation: if the per-factor errors are roughly independent and centered, over-guessing one factor and under-guessing another tend to offset in the product. The output is a Fermi decomposition worksheet, not a lone number. The honest constraint: the cancellation only works when the factors are independent, and the benefit is real mainly for large, unfamiliar quantities - not ordinary ones you could estimate directly.

When to Use

  • You need a numeric magnitude and no lookup-able data and no genuine reference class exists, so the number has to be built from factors.
  • The quantity is large and unfamiliar (market size, total load, total cost, a conversion count you cannot look up) - the regime where decomposition actually helps.
  • An order-of-magnitude answer with an honest band is useful for sizing, sanity-checking, or triage; the number does not have to be exact.
  • You want the estimate inspectable: each factor, its basis, and its band exposed so a reader can challenge one number, not an opaque total.

When NOT to Use

  • A genuine reference class with real base-rate data exists. Then anchor on that data, not on invented factors - use think-reference-class-forecasting. Fermi is precisely the build-from-factors method for when no such class exists; if you have real base rates, reference-class forecasting is strictly better.
  • The task only needs the question decomposed for coverage, not a number. If you want a mutually-exclusive, collectively-exhaustive breakdown of a question and explicitly no estimate, use think-issue-tree, which produces a tree and produces no number. Fermi exists to produce a number; do not use it when a number is not wanted.
  • The quantity is ordinary and familiar. Decomposing something you could estimate directly adds noise; the decomposition benefit was absent or negative in that regime (see evidence/dossier.md).
  • The factors share a driver (correlated). Multiplicative error-cancellation fails when factors move together; the chain can be worse than one careful guess. Flag it and restructure to independent factors, or stop.
  • Never emit a point estimate with no low/high band. A Fermi number without its range hides the uncertainty the method exists to expose.

Instructions

When asked to estimate a magnitude with no data to look up, follow these steps:

  1. State the target quantity precisely, with its unit. Confirm there is no real base-rate data or reference class to use instead (if there is, route to think-reference-class-forecasting). Confirm a number is actually wanted (if not, route to think-issue-tree).
  2. Build the multiplicative factor chain. Write the unknown as a product of sub-quantities, each one small and familiar enough to guess to within roughly a factor. Keep the chain short; prefer factors you can anchor. If a factor sums several named sub-categories, add an explicit "other" term for what is not named. Estimate that "other" term on its own, before summing the named parts. Splitting the named parts more finely raises their summed share. Do not let the finest split crowd out "other."
  3. Give each factor a band and a basis. For every factor, state a low / best / high guess, and where the number came from (a known datum, an analogy, a plausible range). A factor with no stated basis is just a guess in disguise.
  4. Run the independence check. Ask whether any two factors share a driver (move together). If they do, the error-cancellation premise breaks - flag the correlated factors and either restructure to independent factors or note that the range is unreliable.
  5. Combine. Multiply the best-guesses for the point estimate. Multiply the lows for the range floor and the highs for the range ceiling to get the compounded low/high range. Report the estimate as the point value and the range, never the point alone.
  6. Flag the dominant uncertainty. Name the one factor whose band most widens the combined range - that is where tightening one guess would most improve the answer.
  7. Emit the Fermi decomposition worksheet per references/TEMPLATE.md.

Output Format

Use the template in references/TEMPLATE.md. The deliverable is the worksheet: the factor chain, per-factor low/best/high with bases, the point estimate, the compounded low/high range, the independence check, and the dominant-uncertainty flag - not a

阅读完整来源 ↗