跳至正文
OpenAgentSkill
浏览已开放 · 目录记录日期 2026-11-21 · 自动更新和账户服务暂时关闭。
设计与 UI

civil-site-design

Coordinate architectural projects with civil/site engineering: survey and terrain, grading, earthworks, access roads, parking, pedestrian routes, stormwater/drainage, utilities, retaining conditions and Civil 3D workflows. Use for site grading concepts, surface/corridor coordination, utility interfaces and civil-architectural handoff.

MakeItEzzz555 · 已有静态检查记录

安装与使用

运行命令前先阅读来源与依赖说明。复制命令不会自动安装或执行。

npx skills add MakeItEzzz555/Gridline --skill civil-site-design

技能说明


name: civil-site-design description: "Coordinate architectural projects with civil/site engineering: survey and terrain, grading, earthworks, access roads, parking, pedestrian routes, stormwater/drainage, utilities, retaining conditions and Civil 3D workflows. Use for site grading concepts, surface/corridor coordination, utility interfaces and civil-architectural handoff."

Civil / Site Design Coordination

Develop and review site/civil concepts while keeping hydrology, road, geotechnical and utility engineering with qualified civil specialists.

Preflight

  • Topographic/cadastral survey, coordinate/datum system, existing/proposed surfaces, drainage catchments/outfalls, road/access requirements, utilities and geotechnical information.
  • Civil 3D version/workflow when applicable: surfaces, feature lines, alignments, profiles, corridors, pipe/pressure networks and data shortcuts.

Keep verified facts, project assumptions, design options, and unresolved questions visibly separate. If a required input is absent, record it as UNKNOWN rather than inventing it.

Workflow

  1. Preserve survey control and build an existing-conditions/site-constraints model before proposed grading.
  2. Coordinate finished-floor levels, accessible entries, roads/parking, slopes, walls/steps and landscape interfaces against proposed surfaces.
  3. Map stormwater flow paths, utility corridors and service connections; expose conflicts with foundations, trees, public realm and structures.
  4. For Civil 3D work, inventory dynamic dependencies and data shortcuts before edits; validate surfaces, profiles, corridors and quantities after changes.

Deliverables

  • Site/civil coordination plan
  • Level/grading interface matrix
  • Drainage/utility corridor diagram
  • Civil 3D change/verification plan when relevant

Verification

  • Coordinates, datum, units, surface versions and level references are explicit.
  • Cut/fill, hydraulic capacity, pavement and retaining design are not treated as verified without engineering calculations.

For file/model changes, compare the result against a pre-change baseline and report changed items, skipped items, failures, and checks actually run.

Professional boundaries

  • Do not replace licensed civil, drainage, road or geotechnical design.
  • Never move survey control or authoritative utility data without explicit verified instruction.

If a live CAD/BIM/GIS/analysis tool or MCP integration is available, inspect the current document/model and tool version before write operations. Prefer read-only inspection, dry runs, bounded samples, new output paths, and native undo/transaction mechanisms. Never claim a model or drawing was changed unless the tool confirms it.

If the native application is unavailable, produce a reproducible plan, script, structured data, SVG/DXF artifact, or exact in-application procedure instead of pretending to have operated the software.

On-demand evidence and practice references

Load only the relevant reference. These are original review prompts, not binding code or full-book extraction.

  • B12: site and landscape
  • B15: landscape junction review