civil-site-design
Coordinate architectural projects with civil/site engineering: survey and terrain, grading, earthworks, access roads, parking, pedestrian routes, stormwater/drainage, utilities, retaining conditions and Civil 3D workflows. Use for site grading concepts, surface/corridor coordination, utility interfaces and civil-architectural handoff.
MakeItEzzz555 · 已有静态检查记录
安装与使用
运行命令前先阅读来源与依赖说明。复制命令不会自动安装或执行。
npx skills add MakeItEzzz555/Gridline --skill civil-site-design技能说明
name: civil-site-design description: "Coordinate architectural projects with civil/site engineering: survey and terrain, grading, earthworks, access roads, parking, pedestrian routes, stormwater/drainage, utilities, retaining conditions and Civil 3D workflows. Use for site grading concepts, surface/corridor coordination, utility interfaces and civil-architectural handoff."
Civil / Site Design Coordination
Develop and review site/civil concepts while keeping hydrology, road, geotechnical and utility engineering with qualified civil specialists.
Preflight
- Topographic/cadastral survey, coordinate/datum system, existing/proposed surfaces, drainage catchments/outfalls, road/access requirements, utilities and geotechnical information.
- Civil 3D version/workflow when applicable: surfaces, feature lines, alignments, profiles, corridors, pipe/pressure networks and data shortcuts.
Keep verified facts, project assumptions, design options, and unresolved questions visibly separate. If a required input is absent, record it as UNKNOWN rather than inventing it.
Workflow
- Preserve survey control and build an existing-conditions/site-constraints model before proposed grading.
- Coordinate finished-floor levels, accessible entries, roads/parking, slopes, walls/steps and landscape interfaces against proposed surfaces.
- Map stormwater flow paths, utility corridors and service connections; expose conflicts with foundations, trees, public realm and structures.
- For Civil 3D work, inventory dynamic dependencies and data shortcuts before edits; validate surfaces, profiles, corridors and quantities after changes.
Deliverables
- Site/civil coordination plan
- Level/grading interface matrix
- Drainage/utility corridor diagram
- Civil 3D change/verification plan when relevant
Verification
- Coordinates, datum, units, surface versions and level references are explicit.
- Cut/fill, hydraulic capacity, pavement and retaining design are not treated as verified without engineering calculations.
For file/model changes, compare the result against a pre-change baseline and report changed items, skipped items, failures, and checks actually run.
Professional boundaries
- Do not replace licensed civil, drainage, road or geotechnical design.
- Never move survey control or authoritative utility data without explicit verified instruction.
If a live CAD/BIM/GIS/analysis tool or MCP integration is available, inspect the current document/model and tool version before write operations. Prefer read-only inspection, dry runs, bounded samples, new output paths, and native undo/transaction mechanisms. Never claim a model or drawing was changed unless the tool confirms it.
If the native application is unavailable, produce a reproducible plan, script, structured data, SVG/DXF artifact, or exact in-application procedure instead of pretending to have operated the software.
On-demand evidence and practice references
Load only the relevant reference. These are original review prompts, not binding code or full-book extraction.
- B12: site and landscape
- B15: landscape junction review