building-envelope-performance
Develop and review facade/roof/foundation envelope strategies for water, air, vapor, thermal, solar, acoustic and durability performance. Use for wall/roof assemblies, glazing, thermal bridges, condensation risk, waterproofing, interfaces, facade details and envelope QA.
MakeItEzzz555 · 已有静态检查记录
安装与使用
运行命令前先阅读来源与依赖说明。复制命令不会自动安装或执行。
npx skills add MakeItEzzz555/Gridline --skill building-envelope-performance技能说明
name: building-envelope-performance description: Develop and review facade/roof/foundation envelope strategies for water, air, vapor, thermal, solar, acoustic and durability performance. Use for wall/roof assemblies, glazing, thermal bridges, condensation risk, waterproofing, interfaces, facade details and envelope QA.
Building Envelope Performance
Coordinate continuous performance layers and buildable interfaces; source product and climate data rather than inventing it.
Preflight
- Climate/location, indoor design conditions, exposure, orientation, assembly geometry and structural support.
- Target thermal/air/water/acoustic/fire performance, product data, applicable standards and consultant inputs.
Keep verified facts, project assumptions, design options, and unresolved questions visibly separate. If a required input is absent, record it as UNKNOWN rather than inventing it.
Workflow
- Draw continuity diagrams for water, air, vapor and thermal control layers through representative interfaces.
- Review openings, parapets, balconies, roofs, foundations and material transitions for drainage, movement, thermal bridges and sealant/flashing continuity.
- Evaluate preliminary thermal/moisture risks using verified material properties and climate assumptions; request specialist analysis when needed.
- Translate the strategy into outline details, performance requirements and mock-up/testing questions.
Deliverables
- Envelope control-layer diagrams
- Interface/detail risk register
- Performance requirement matrix
- Testing/mock-up and consultant questions
Verification
- Control layers remain continuous across sections/details and product properties are sourced.
- Condensation/U-value/acoustic/fire statements identify method, inputs and limitations.
For file/model changes, compare the result against a pre-change baseline and report changed items, skipped items, failures, and checks actually run.
Professional boundaries
- Do not certify facade, waterproofing, hygrothermal, fire or structural performance.
- Do not fabricate manufacturer values or substitute generic details for project-specific engineering.
If a live CAD/BIM/GIS/analysis tool or MCP integration is available, inspect the current document/model and tool version before write operations. Prefer read-only inspection, dry runs, bounded samples, new output paths, and native undo/transaction mechanisms. Never claim a model or drawing was changed unless the tool confirms it.
If the native application is unavailable, produce a reproducible plan, script, structured data, SVG/DXF artifact, or exact in-application procedure instead of pretending to have operated the software.
On-demand evidence and practice references
Load only the relevant reference. These are original review prompts, not binding code or full-book extraction.
- B01: envelope continuity
- B02: system completeness