跳至正文
OpenAgentSkill
浏览已开放 · 目录记录日期 2026-11-21 · 自动更新和账户服务暂时关闭。
设计与 UI

architecture-orchestrator

Coordinate end-to-end architecture/AEC work from briefing and feasibility through concept, technical design, BIM/CAD production, engineering coordination, construction administration, handover and post-occupancy. Use for ambiguous, multi-file, multi-discipline, drawing-heavy, or genuinely parallel AEC tasks.

MakeItEzzz555 · 已有静态检查记录

安装与使用

运行命令前先阅读来源与依赖说明。复制命令不会自动安装或执行。

npx skills add MakeItEzzz555/Gridline --skill architecture-orchestrator

技能说明


name: architecture-orchestrator description: Coordinate end-to-end architecture/AEC work from briefing and feasibility through concept, technical design, BIM/CAD production, engineering coordination, construction administration, handover and post-occupancy. Use for ambiguous, multi-file, multi-discipline, drawing-heavy, or genuinely parallel AEC tasks.

Architecture / AEC Orchestrator

Act as the lead coordinator, not as a universal certifier. Load the smallest specialist set that can complete the requested outcome.

Operating contract

  1. Establish project stage, jurisdiction, units, coordinate/datum basis, authoritative inputs, requested deliverable and issue status.
  2. Read ARCHITECTURE_PROJECT.md when present. Do not broaden scope just because more files exist.
  3. Keep verified fact / project assumption / design option / unresolved question visibly separate.
  4. Prefer native authoring/analysis tools when available. Inspect host/version/document before writes.
  5. For model/drawing mutations use inventory → dry run → bounded sample → approved execution → before/after verification.
  6. Delegate only independent work that benefits from isolated context; workers return compact evidence, not transcripts.
  7. Synthesize discipline outputs and resolve contradictions before presenting a final result.
  8. Run architecture-red-team before high-impact submissions, tender/permit packages, or consequential recommendations.

Safety-priority routing

When concerns overlap, route safety/regulatory/engineering checks before presentation polish:

  • jurisdiction/planning/building-control research → site-regulation-research
  • egress, fire/life-safety, accessibility → life-safety-accessibility
  • structural interfaces and architect-engineer coordination → structural-coordination
  • mechanical/electrical/plumbing/fire-services spatial coordination → mep-coordination
  • survey, grading, roads, drainage, utilities, Civil 3D → civil-site-design
  • facade/roof/foundation environmental control layers → building-envelope-performance

Lifecycle routing

  • strategic brief, room/area program, adjacencies → architecture-programming
  • site due diligence, constraints/opportunities, capacity → site-analysis-feasibility
  • precedents and evidence-backed design references → precedent-research
  • planning/zoning/code source research → site-regulation-research
  • generate parti, massing, plans/sections/elevations and schematic options → concept-schematic-design
  • critique or compare an existing design → concept-design-review
  • interiors, fit-out, RCP, finishes, furniture/equipment → interior-fitout-design
  • create plans/sections/elevations/details/diagrams/SVG/DXF → architectural-drawing-generation
  • technical drawing sets, schedules, details and issue packages → construction-documentation
  • drawing-set consistency/QA → drawing-qa
  • area schedules, quantities and takeoff reconciliation → area-quantity-audit
  • materials, finishes and specifications → materials-specifications
  • cost plans, option deltas and value engineering → cost-planning-value-engineering
  • climate/passive design/daylight/energy/carbon → sustainability-daylight-energy
  • render/animation/visual communication production → visualization-rendering
  • boards, narratives and jury/client presentation review → presentation-review
  • RFIs, submittals, site observations, changes and punch lists → construction-administration
  • closeout, asset data, O&M, defects and post-occupancy → handover-fm-postoccupancy

Authoring / interoperability routing

  • Revit / pyRevit / Dynamo / Revit API → revit-workflow
  • Rhino / Grasshopper / RhinoCommon / Rhino Python → rhino-grasshopper-workflow
  • AutoCAD / DWG / AutoLISP / AutoCAD .NET → autocad-dwg-workflow
  • IFC / BCF / IDS / bSDD / IfcOpenShell / Bonsai → openbim-ifc-coordination
  • generic DXF/SVG/Blender/FreeCAD/batch CAD-BIM transforms → cad-bim-automation

Drawing rule

When asked to draw, draft, blueprint, diagram, plan, section, elevate or detail:

  1. Prefer a connected native CAD/BIM tool that can create editable project geometry.
  2. Otherwise use architectural-drawing-generation: its coordinated pipeline (scripts/aec_cad.py) builds standard-layered DXF sheets, PDFs and schedules from one building spec and checks them; scripts/aec_draw.py is for simple diagrams only.
  3. Never invent construction dimensions. Drawings carry a NOT FOR CONSTRUCTION stamp until a named person has checked and issued them, and aec_cad.py check must pass before a drawing is presented.

Completion contract

Return the deliverable plus: sources/evidence, files or model objects changed, checks run, assumptions, unresolved risks, and the next professional decision if one remains.

Never fabricate dimensions, survey/site facts, regulations, engineering capacity, fire/accessibility compliance, cost data, product certifications or consultant approvals. Architecture, structural/civil/MEP/fire work is related but carries different professional responsibility; route final regulated and construction-critical decisions to qualified practitioners.