跳至正文
OpenAgentSkill
浏览已开放 · 目录记录日期 2026-11-21 · 自动更新和账户服务暂时关闭。
开发与测试

nacl-ba-full

Coordinate complete NaCl BA graph creation through phased Codex orchestration with explicit handoff contracts and user confirmation gates. Use when creating a full BA graph, complete business analysis, or compatibility with `/nacl-ba-full`.

ITSalt · 已有静态检查记录

安装与使用

运行命令前先阅读来源与依赖说明。复制命令不会自动安装或执行。

npx skills add ITSalt/NaCl --skill nacl-ba-full

技能说明


name: nacl-ba-full description: | Coordinate complete NaCl BA graph creation through phased Codex orchestration with explicit handoff contracts and user confirmation gates. Use when creating a full BA graph, complete business analysis, or compatibility with /nacl-ba-full.

NaCl BA Full For Codex

Packaged Gateway Binding

Read the packaged gateway binding and use only its ba-resource sequence. The pilot supports protected Board metadata, not the full BA domain graph. Any phase requiring an unavailable BA label, relationship, or named read returns BLOCKED/BA_DOMAIN_RESOURCE_UNAVAILABLE; never claim the full BA graph is verified from file-only output.

Coordinate full BA graph creation without assuming a separate isolated runner. BA artifacts remain Russian where the NaCl methodology requires Russian.

Read ../references/orchestration-model.md, ../references/migration-rules.md, ../references/verification-vocabulary.md, ../references/ba-codex-contract.md, and ../nacl-core/SKILL.md before executing this skill.

Goal Boundary

This skill is not safe to wrap in /goal because BA completion includes the mandatory BA-to-SA handoff judgment gate. Use this skill interactively, then use a goal-wrapped verification alias only after the gate is complete.

Reference ../nacl-goal/SKILL.md, ../references/goal-codex-contract.md, and ../../nacl-goal/refusal-catalog.md. The refusal code is REFUSE_HUMAN_GATE_BA_SA_HANDOFF. Do not provide bypass flags. If autonomous execution is requested, report Status: BLOCKED or Status: NOT_RUN.

Contract

Inputs consumed:

  • user-provided business facts, goals, boundaries, constraints, and open questions;
  • existing BA graph records when graph access is available;
  • BA graph schema and query references when file access is available;
  • downstream phase reports using the closed verification vocabulary.

Outputs produced:

  • phased BA progress report using only the closed vocabulary;
  • graph change requests or graph updates when graph tooling is available and confirmed;
  • reviewed downstream output summaries for each phase;
  • BA-to-SA handoff readiness report.

Downstream consumers:

  • human user;
  • SA workflow;
  • publishing workflow;
  • graph query or visualization workflows.

Orchestration Rules

  • Use the shared Codex orchestration procedure from ../references/orchestration-model.md.
  • Apply the BA orchestrator contract from ../references/ba-codex-contract.md.
  • Each phase handoff must state inputs consumed, expected graph output, allowed verification status, downstream consumer, and handling for VERIFIED, FAILED, PARTIALLY_VERIFIED, BLOCKED, NOT_RUN, and UNVERIFIED.
  • Run, invoke, or simulate downstream procedures only when the current Codex environment supports the needed tools.
  • Collect and inspect downstream output before changing progress state or opening the next phase gate.
  • Stop after each phase and ask the user whether to proceed to the next phase.
  • Do not write graph data, modify files, publish, or move to the next major phase without explicit user confirmation.
  • Never mark a delegated phase complete until its output has been inspected and its graph or graph-ready evidence is compatible with the phase contract.

Workflow

Phase 0: Resume And Scope

Check config.yaml, schema availability, and graph tool availability when file or graph access exists. Detect existing BA graph state for SystemContext, ProcessGroup, BusinessProcess, WorkflowStep, BusinessEntity, BusinessRole, GlossaryTerm, BusinessRule, ValidationReport, and HandoffPackage.

Report detected state with closed vocabulary. Stop and ask the user to confirm the starting phase.

If graph tools are unavailable, Phase 0 must still inspect file-based schema and query references where possible, then report graph state as BLOCKED or UNVERIFIED and continue only with a graph-ready plan approved by the user.

Phase 1: Context

Use the nacl-ba-context procedure when the current environment can execute that specialist contract; otherwise run the same phase locally and report the missing mechanism as BLOCKED or UNVERIFIED.

Contract:

  • Inputs: user facts, current graph state, BA schema.
  • Expected output: SystemContext, Stakeholder, ExternalEntity, and DataFlow records or a graph-ready change plan.
  • Downstream consumer: process discovery.
  • Gate: review scope, stakeholders, external entities, and data flows with the user before Phase 2.

Phase 2: Business Processes

Coordinate process group and business process creation.

Contract:

  • Inputs: confirmed context, business goals, stakeholder interactions.
  • Expected output: ProcessGroup, BusinessProcess, and process relationship records or a graph-ready change plan.
  • Downstream consumer: workflow decomposition.
  • Gate: review process map coverage before Phase 3.

Phase 3: Workflows

For each decomposed business process, coordinate workflow creation sequentially.

Contract:

  • Inputs: confirmed business process, actors, artifacts, decisions, and known automation candidates.
  • Expected output: WorkflowStep records and workflow relationships or a graph-ready change plan.
  • Downstream consumer: business entity and role catalogs.
  • Gate: review each workflow before starting the next workflow or Phase 4.

Phase 4: Business Entities

Coordinate business object cataloging from workflows and user facts.

Contract:

  • Inputs: confirmed workflows and referenced artifacts.
  • Expected output: BusinessEntity, EntityAttribute, EntityState, and entity-process relationship records or a graph-ready change plan.
  • Downstream consumer: role, glossary, and rule phases.
  • Gate: review entity catalog and matrix before Phase 5.

Phase 5: Business Roles

Coordinate role discovery and role-process mapping.

Contract:

  • Inputs: confirmed processes, workfl
阅读完整来源 ↗