update-plan

Update an existing plan's status, todo list, and phase progress. Tracks what was done, updates completion status, and maintains the changelog. Use this skill during or after working on a plan phase to keep planning artifacts current.

DasDigitaleMomentum · 已有静态检查记录

安装与使用

运行命令前先阅读来源与依赖说明。复制命令不会自动安装或执行。

npx skills add DasDigitaleMomentum/opencode-processing-skills --skill update-plan

技能说明


name: update-plan description: Update an existing plan's status, todo list, and phase progress. Tracks what was done, updates completion status, and maintains the changelog. Use this skill during or after working on a plan phase to keep planning artifacts current. license: MIT compatibility: opencode metadata: category: planning phase: maintenance

Skill: Update Plan

What This Skill Does

Keeps planning artifacts synchronized with actual progress:

  • Updates todo items (mark done, add new items, note blockers)
  • Updates phase status (pending → in_progress → completed)
  • Updates plan status and changelog
  • Updates implementation plan if approach changed during work
  • Prepares for next phase when current phase completes

When to Use

  • During work on a plan phase: to track progress in real-time
  • After completing work: to mark items and phases as done
  • When blockers are discovered: to document them
  • When the implementation approach changes: to update the implementation plan
  • After a plan review: to apply accepted Remove / Merge / Simplify findings while keeping scope artifacts consistent
  • When the user asks to "update the plan" or "mark phase as done"

Execution Model (Recommended)

  • Preferred: the primary agent runs this skill and updates artifacts under plans/<name>/.
  • Rationale: plan updates encode session decisions and current intent; the primary has the best access to that context.
  • Use doc-explorer only if verifying acceptance criteria requires codebase analysis (results are written to docs/).
  • Optional (edge cases): delegate mechanical edits (bulk todo moves, large reshuffles) to doc-explorer if needed.

Routing Matrix (Who does what)

  • Writes: updates under plans/<name>/ including plan.md, todo.md, phases/**, and (when needed) implementation/**.
  • Primary: preferred owner for updates (session decisions/intents live here).
  • doc-explorer: optional helper for mechanical edits or codebase analysis to verify acceptance criteria.
  • implementer: never used for plan maintenance.

Workflow

Step 1: Identify the Plan

Find the active plan:

  • Check plans/ directory for existing plans
  • If multiple plans exist, use the question tool to ask the user which plan
  • Read the plan's plan.md to understand the current status
  • Read todo.md to see current task state

Step 2: Determine What to Update

Option A: Todo updates (most common)

  • Mark completed items: move from Pending/In Progress to Completed
  • Add new items discovered during work
  • Mark blocked items with reason
  • Move next items to In Progress

Option B: Phase completion

  • Verify all acceptance criteria from the phase document are met
  • Update phase status in phases/phase-N.md frontmatter
  • Update the phases table in plan.md
  • Populate todo list with next phase's items (from implementation plan)
  • Add changelog entry

Option C: Implementation plan revision

  • If the technical approach changed during implementation
  • Update the affected implementation/phase-N-impl.md
  • Document the reason for the change
  • Update any affected todo items

Option D: Plan-level updates

  • Requirements changed → update plan.md
  • New risks identified → add to risks table
  • Scope adjustment → update scope section

Option E: Plan-review remediation

  • Inputs: immutable plan-review artifact, accepted finding IDs, explicitly rejected IDs with rationale, and user/primary decisions
  • Apply accepted Remove, Merge, and Simplify dispositions across plan.md, pending phase files, todo.md, and affected references
  • Do not invent replacement phases, abstractions, infrastructure, requirements, or acceptance criteria
  • Record applied finding IDs and material scope decisions in the changelog
  • If execution has not started, remove obsolete pending phase artifacts after explicit approval; if history exists, preserve it and mark the phase skipped or superseded with a concise pointer
  • Keep the review artifact immutable
  • Update references directly affected by the reduction, then stop; do not create a general plan-audit pass

Step 3: Apply Updates

Updating Todo List (todo.md)

### Completed
- [x] Implement user authentication endpoint (2025-02-14)

### In Progress
- [ ] Add input validation for login form

### Pending
- [ ] Write integration tests for auth flow

### Blocked
- [ ] Deploy to staging - waiting for CI pipeline fix

Always add a changelog entry:

### 2025-02-14
- Completed: Implement user authentication endpoint
- Started: Add input validation for login form
- Blocked: Deploy to staging (CI pipeline issue)

Updating Phase Status

In phases/phase-N.md frontmatter:

status: completed  # was: in_progress
updated: "2025-02-14"

Updating Plan Changelog

In plan.md:

### 2025-02-14
- Phase 1 completed, Phase 2 started

Step 4: Phase Transition

When a phase is completed and the next phase begins:

  1. Mark current phase as completed
  2. Mark next phase as in_progress
  3. Read the next phase's implementation plan
  4. Populate the todo list with the next phase's implementation steps
  5. Update the todo list's Phase Context section: update phase/implementation links, relevant docs, and latest handover reference
  6. Update plan status in plan.md if needed
  7. Add changelog entry documenting the transition

When the final phase is completed (Plan Completion):

  1. Mark the final phase as completed
  2. Update plan status in plan.md frontmatter to completed
  3. Verify that the overall Definition of Done is met
  4. Add a final changelog entry: "Plan completed"
  5. Clear the todo list's active phase header or add a "Plan Completed" note
  6. Use the question tool to confirm with the user that the plan is truly done

Step 5: Report

Summarize what was updated. If the phase is complete, highlight:

  • What was achieved
  • Whether all acceptance criteria were met
  • What com