name: piv-implement description: Executes an implementation plan task-by-task with validation at every step. Use when you have a completed feature plan and want to implement it in one pass. argument-hint: [path-to-plan]

Execute: Implement from Plan

Plan to Execute

Read plan file: $ARGUMENTS

Before you start — work on a feature branch

A ticket gets built on its own branch, so it can become one PR. Ideally you're already on that branch — cut it before planning — so the plan commit you made is on it and rides into the PR; a plan committed on the base branch won't be in this branch's PR. If you're still on base, this step creates the branch now. Detect the base branch (don't hardcode main): git symbolic-ref refs/remotes/origin/HEAD 2>/dev/null | sed 's@^refs/remotes/origin/@@' (fallback main).

  • On the base branch, clean → create one: git checkout -b feature/<plan-slug>.
  • Already on a feature branch or in a worktree → use it.
  • On the base branch with uncommitted changes → STOP: commit or stash first.

(One branch per ticket is also what makes parallel worktrees clean later.)

Execution Instructions

1. Read and Understand

  • Read the ENTIRE plan carefully
  • Understand all tasks and their dependencies
  • Note the validation commands to run
  • Review the testing strategy

2. Execute Tasks in Order

For EACH task in "Step by Step Tasks":

a. Navigate to the task

  • Identify the file and action required
  • Read existing related files if modifying

b. Implement the task

  • Follow the detailed specifications exactly
  • Maintain consistency with existing code patterns
  • Include proper type hints and documentation
  • Add structured logging where appropriate

c. Verify as you go

  • After each file change, check syntax
  • Ensure imports are correct
  • Verify types are properly defined
  • Run the task's own VALIDATE command before starting the next task. Every task in the plan carries one. A task is not done until its check passes — if it fails, fix it now rather than carrying the failure forward. The full suite still runs at step 4; this is the per-task gate that keeps step 4 from becoming a pile-up.

3. Implement Testing Strategy

After completing implementation tasks:

  • Create all test files specified in the plan
  • Implement all test cases mentioned
  • Follow the testing approach outlined
  • Ensure tests cover edge cases

4. Run Validation Commands

Execute ALL validation commands from the plan in order:

# Run each command exactly as specified in plan

If any command fails:

  • Fix the issue
  • Re-run the command
  • Continue only when it passes

5. Final Verification

Before completing:

  • ✅ All tasks from plan completed
  • ✅ All tests created and passing
  • ✅ All validation commands pass
  • ✅ Code follows project conventions
  • ✅ Documentation added/updated as needed

Output — write an implementation report

Write a short report to .claude/reports/<plan-slug>-report.md (and print the summary). This is what the PR body and the piv-review-pr gate read — especially the deviations (a documented deviation is an intentional decision the reviewer should not flag):

# Implementation Report — <feature>

**Plan**: <path>   **Branch**: <feature/...>   **Status**: COMPLETE | PARTIAL

## Summary
{What was built, 2-4 sentences.}

## Tasks completed
- [task] → `path/to/file` (CREATE/UPDATE)

## Tests added
{Test files + cases + results.}

## Validation results
{Type-check / lint / tests / build — pass/fail with counts.}

## Deviations from the plan
{What changed vs the plan and WHY — or "none". This is the reviewer's signal of intent.}

## Issues encountered
{Anything notable, or "none".}

Ready for the next step

  • Confirm all changes are complete and validations pass.
  • Next: piv-commit the work, then piv-create-pr to open the PR (the report fills the PR body), then piv-review-pr.

Notes

  • If you encounter issues not addressed in the plan, document them
  • If you need to deviate from the plan, explain why
  • If tests fail, fix implementation until they pass
  • Don't skip validation steps