This skill handles SAP PP (Production Planning) including MRP, production orders, process orders, shop floor control, capacity planning, BOM management, routing, and PP-PI for process industries. Use when user mentions PP, MRP, MD01, MD04, production order, CO01, CO11N, MFBF, BOM, routing, work center, capacity, planned order, operation, confirmation, goods issue, backflush, MRP Live, MPS, demand management, scheduling, process order, PP-PI, KANBAN.
BoxLogoDev · 已有静态检查记录
安装与使用
运行命令前先阅读来源与依赖说明。复制命令不会自动安装或执行。
npx skills add BoxLogoDev/sapstack --skill sap-pp技能说明
name: sap-pp description: > This skill handles SAP PP (Production Planning) including MRP, production orders, process orders, shop floor control, capacity planning, BOM management, routing, and PP-PI for process industries. Use when user mentions PP, MRP, MD01, MD04, production order, CO01, CO11N, MFBF, BOM, routing, work center, capacity, planned order, operation, confirmation, goods issue, backflush, MRP Live, MPS, demand management, scheduling, process order, PP-PI, KANBAN. allowed-tools: Read, Grep
1. MRP (Material Requirements Planning)
Planning Run
- MD01 (ECC / S/4HANA): classic total planning run for the configured planning scope
- MD01N (S/4HANA): MRP Live → HANA-optimized, faster, recommended
- MD02: single-item, multi-level MRP (for testing / selective re-planning)
- MD03: single-item, single-level
MRP Types (Material Master MRP 1 view)
| Type | Description |
|---|---|
| PD | MRP — demand-driven (standard) |
| VB | Manual reorder point |
| VM | Automatic reorder point |
| ND | No MRP |
Lot Sizing Procedures
| Key | Description |
|---|---|
| EX | Lot-for-lot (exact demand quantity) |
| FX | Fixed lot size |
| WB | Weekly lot size |
| MB | Monthly lot size |
| HB | Replenishment up to maximum stock level |
Exception Messages (MD04)
Do not memorize a universal numeric lookup table. Interpret the exception text, exception group, element type, requirement/receipt dates, firming state, and the plant's rescheduling horizon/tolerance settings shown in the actual system. An exception is a planning signal, not authorization to move or delete supply.
2. Production Order
Lifecycle
CO01 (Create) → governed Release → Goods Issue (MIGO 261)
→ Confirmation (CO11N) → Final Confirmation → TECO (technically complete)
→ Settlement (KO88) → CLSD (closed)
Key T-codes
| T-code | Description |
|---|---|
| CO01 | Create production order |
| CO02 | Change production order |
| CO03 | Display production order |
| CO11N | Production order confirmation |
| CO13 | Cancel confirmation |
| CO24 | Missing parts list (component shortage) |
| COOIS | Production order information system |
| MIGO | Goods issue (261) / GR (101) for order |
Goods Issue
- Manual: MIGO → movement type 261 → production order number
- Backflush: CO11N → backflush checkbox → automatic at confirmation
- Partial GI: allowed — tracks remaining requirements in MD04
Settlement
- KO88: individual order → settlement to: cost center / G/L / material (product cost collector)
- Always simulate first → check receivers and amounts before actual posting
- Variance categories: input price / input quantity / output price / output quantity / remaining input
3. Process Orders (PP-PI)
Used in: chemical, pharmaceutical, food & beverage industries
| T-code | Description |
|---|---|
| COR1 | Create process order |
| COR2 | Change process order |
| COR6N | Process order confirmation |
| CORK | PI sheet (process instruction) execution |
| CORZ | Process order scheduling |
Process instructions (PI sheets): define what operators enter during production Master recipe (C201): replaces routing for process industries
4. BOM Management
Key T-codes
| T-code | Description |
|---|---|
| CS01 | Create BOM |
| CS02 | Change BOM |
| CS03 | Display BOM |
| CS11 | BOM explosion (multi-level) |
| CS14 | BOM comparison |
| CS15 | Where-used list |
BOM Usages
| Usage | Description |
|---|---|
| 1 | Production |
| 2 | Engineering / design |
| 3 | Universal |
| 5 | Sales |
| 6 | Costing |
- Alternative BOMs: same material, multiple production methods (alt. 1, 2, 3...)
- Selection method: MRP 4 view → BOM explosion / selection method
5. Routing and Work Centers
Work Center (CR01 / CR02)
- Define: capacity category, available capacity, costing formulas, scheduling formulas
- Capacity: CR11 → available capacity per shift (machine / labor)
Routing (CA01 / CA03)
- Operations: sequence → work center → standard values (setup / machine / labor time)
- Control key: determines: confirmation required / goods movement / costing / scheduling
Reference Operation Sets (CA11)
- Reusable operation templates → assign to multiple routings
6. Capacity Planning
| T-code | Description |
|---|---|
| CM01 | Capacity load overview (work center) |
| CM21 | Capacity leveling (interactive) |
| CM50 | Variable capacity planning |
| CM99 | Scheduling overview |
- Classic MRP quantity/date planning does not by itself prove finite capacity feasibility; evaluate and level capacity separately or use the configured detailed scheduling solution.
- Bottleneck analysis: CM50 → identify overloaded work centers
7. Demand Management
- MD61: planned independent requirements (make-to-stock strategy)
- MD62: change planned independent requirements
- Strategy group (MRP 3 view): determines how sales orders consume PIRs
- Strategy 10: make-to-stock (no individual requirements)
- Strategy 20: make-to-order (each order = separate production)
- Strategy 40: planning with final assembly
8. S/4HANA PP Changes
| Feature | ECC | S/4HANA |
|---|---|---|
| MRP run | MD01 | MD01N (MRP Live) recommended |
| MRP performance | Slower (sequential) | Parallel HANA-based |
| Exception handling | MD04 list | Enhanced exception management |
| Scheduling board | CM21 | Production Scheduling Board (Fiori) |
| Shop floor | COOIS | Manufacturing Execution Fiori apps |
| eWM integration | External WM | Embedded eWM (same system) |
| pMRP | Not available | simulation capability for identifying potential capacity issues; scope/release dependent |
9. Diagnostic Response Contract
Use Quick Advisory only for a stable single fact. Use the Evidence Loop when MRP created an unexpected proposal, a confirmation failed, ATP differs from