This skill handles all SAP CO (Controlling) topics: cost center accounting, profit center accounting, internal orders, product costing, profitability analysis (CO-PA), assessment and distribution cycles, actual vs plan postings, settlement, and CO period-end closing. Use when user mentions CO, cost center, profit center, internal order, KSU5, KSV5, KO88, CK11N, CO-PA, COPA, assessment, distribution, settlement, variance, controlling area, allocation cycle, activity type, KSB1, KSB5, cost element, plan vs actual, product cost collector.
name: sap-co
description: >
This skill handles all SAP CO (Controlling) topics: cost center accounting,
profit center accounting, internal orders, product costing, profitability
analysis (CO-PA), assessment and distribution cycles, actual vs plan postings,
settlement, and CO period-end closing. Use when user mentions CO, cost center,
profit center, internal order, KSU5, KSV5, KO88, CK11N, CO-PA, COPA, assessment,
distribution, settlement, variance, controlling area, allocation cycle, activity type,
KSB1, KSB5, cost element, plan vs actual, product cost collector.
allowed-tools: Read, Grep
1. Environment Questions
Ask before answering:
Controlling area (KOKRS) — single or cross-company code?
Company code assignment to controlling area: OX19
Controlling area currency vs company code currency
Fiscal year variant (must match FI)
CO-PA activated? If yes: costing-based, account-based, or both?
Material Ledger foundation active? S/4HANA에서는 inventory valuation의 기반이며,
actual costing run 활성화 여부는 별도로 확인한다.
2. Cost Center Accounting (CCA)
Period-End Sequence
Repost FI → CO if needed: KB11N (manual reposting) / KB15N (activity allocation)
Enter statistical key figures: KB31N (required for assessment/distribution bases)
Budget: KO22 (budget entry) → OKOB (availability control tolerance)
Commitment management: orders can carry purchase order commitments
Settlement (KO88)
KO88: individual order settlement
Always simulate first (test run)
Settlement rule: inspect the sender master from the settlement context; maintain
receivers and percentages only through the approved master-data process
Common Errors
Error
Fix
"Order is locked"
Inspect sender system/user status; request governed release only when business prerequisites are met
"No settlement rule defined"
Inspect sender settlement data; create the approved receiver rule through the master-data owner
"Receiver not valid"
Check settlement profile allows this receiver type
"Budget exceeded"
KO22 → increase budget or KO26 (supplement)
5. Product Costing (CO-PC)
Standard Cost Estimate Flow
CK11N (single material) → cost estimate per material / plant / lot size
CK40N (costing run) → mass processing across multiple materials
CK24 → Mark (set as future std cost) → Release (activate)
Configuration Elements
Cost component structure: OKTZ → groups cost elements into components (material / labor / overhead)
Overhead: KZS2 → costing sheet → overhead rates
Activity rates: KP26 → plan activity prices per cost center / activity type