timing-discipline

Compute-planning rules. Use before launching any calculation whose runtime is not already measured — and whenever an agent proposes a long run, an overnight grind, or a bigger machine as the way forward.

BootLoops-ai · 已有静态检查记录

安装与使用

运行命令前先阅读来源与依赖说明。复制命令不会自动安装或执行。

npx skills add BootLoops-ai/skills --skill timing-discipline

技能说明


name: timing-discipline description: Compute-planning rules. Use before launching any calculation whose runtime is not already measured — and whenever an agent proposes a long run, an overnight grind, or a bigger machine as the way forward.

timing-discipline — measure first, restructure early

The expensive mistake in computational work is rarely the wrong algorithm. It is the run that consumes a night, a weekend, or a machine-week and returns something a ten-minute pilot would have predicted. Runtime intuition is systematically optimistic — in people, and worse in language models, which produce fluent, confident durations for jobs they have never timed, because plausible-sounding ETAs are easy to generate and nothing in the generation process consults a clock. Hence the founding rule:

An estimate not derived from a measurement of this calculation, in this configuration, on this machine, is a guess. Every projection is either (a) fit from the job's own time-stamped log, (b) taken from a measured prior run of identical configuration on the same hardware, or (c) reported as "unknown — measuring now." There is no fourth category.

The second rule is what to do with the measurement. When a projection comes out long — past a couple of hours — the right response is almost never a bigger run, a bigger machine, or an overnight slot. It is restructuring the problem so the run shrinks. Measured honestly, most long projections are the computation telling you that you are solving it the wrong way.

Procedure

  1. Pilot before anything that might be long. Same code, same machine, same settings, same distribution of cases — scaled down in size only, with a time-stamped log. If the job cannot be scaled down, that is itself a design defect worth fixing before launch, because it also means the job cannot be checkpointed or partially salvaged.

  2. Fit the rate from the steady-state window. Discard the startup transient: the first items carry compilation, cache fill, and input loading, and a rate fit across them is wrong in whichever direction hurts more. Then check the per-item cost trend across the pilot. If cost grows with index — swelling expressions, accumulating state, rising memory — a linear extrapolation is a floor, not a forecast: run the pilot at two sizes and fit the growth exponent instead.

  3. Write the projection down with its provenance before launching: pilot size, window used, measured rate, scaling assumption. A projection whose provenance cannot be stated in one line is an estimate wearing a number.

  4. Apply the threshold. If the projection exceeds a couple of hours, stop. Do not launch, do not reach for more cores. Restructure instead, and actually enumerate the candidates: a better representation or basis; an exact reduction that shrinks the object before any numerics touch it; a symmetry that collapses the case count; a split into independent pieces; a cheap method for the bulk of the cases with the expensive one reserved for the residue; a limit or special case that answers the actual question without the general computation. The restructured route usually exists, and when it exists it beats hardware by more than hardware can give.

  5. Fresh eyes before any long run. Before committing to a projection near or over the threshold, have someone — or a separately prompted agent with no stake in the current plan — spend a short, bounded effort on one question: is there a structurally smarter route? Record the verdict either way. "Current route is right because X" is a valid outcome; silence is not, because the absence of a recorded verdict is indistinguishable from the question never having been asked.

  6. Define real progress before launch. Name the output unit the run exists to produce and the file or table where it accumulates. Monitoring watches that count. Log volume, CPU load, and process liveness are not progress; they are signs of activity, and activity is what a stuck job emits too.

  7. A rate collapse voids the projection. If the measured rate drops severalfold mid-run, stop quoting the old ETA that instant. Diagnose, re-measure, re-plan. A projection is conditional on the rate it was fit from; when the rate goes, the projection is gone with it.

  8. Re-measure on any change. New machine, new input regime, new working precision, new parameter range: the old rate does not transfer, however similar the job looks. Rates are properties of a configuration, not of an algorithm.

Failure modes

Each of these has burned real time. Each looks reasonable from the inside while it is happening.

The unmeasured overnight launch. A job goes up at the end of the day because the day is ending, on the theory that the night is free anyway. Morning finds it a small fraction done, dead, or wedged — and the night was not free: it cost the diagnosis time, the cleanup, and a day of schedule built on the assumption it would finish. The launch decision was made by the calendar, not by a measurement.

The intuition ETA. "About an hour, probably." From a person this is optimism; from a model it is fluent confabulation with the grammar of a measurement. The tell is that no log exists from which the number could have been derived. The question that kills it is three words: measured from what?

The startup-transient fit. A rate fit from the first items either includes one-time warm-up costs — projecting the run as far grimmer than it is, so a feasible job gets canceled — or is taken after caches are warm and omits a cost the full run pays over and over. Both are cured by fitting the steady-state window and saying which window was used.

Linear extrapolation of a superlinear cost. Every item slightly costlier than the last: growing intermediate expressions, an accumulating store, memory pressure building toward swap. The pilot's rate i