mep-coordination
Coordinate architectural design with mechanical, electrical, plumbing, fire-protection and vertical-service requirements. Use for plant rooms, shafts, risers, ceiling/service zones, distribution routes, equipment access, louvers, drainage interfaces, penetrations and clash-resolution planning.
MakeItEzzz555 · Static checks on file
Installation
Read the source and dependencies before running a command. Copying does not install or execute anything.
npx skills add MakeItEzzz555/Gridline --skill mep-coordinationAbout this skill
name: mep-coordination description: Coordinate architectural design with mechanical, electrical, plumbing, fire-protection and vertical-service requirements. Use for plant rooms, shafts, risers, ceiling/service zones, distribution routes, equipment access, louvers, drainage interfaces, penetrations and clash-resolution planning.
MEP / Building Services Coordination
Protect spatial allowances, access and architectural intent while routing discipline calculations to qualified engineers.
Preflight
- Available MEP/fire drawings/models, equipment schedules, plant/shaft requirements, ceiling zones, structural constraints and maintenance/replacement routes.
- Rooms with special environmental, plumbing, power, data, ventilation or acoustic needs.
Keep verified facts, project assumptions, design options, and unresolved questions visibly separate. If a required input is absent, record it as UNKNOWN rather than inventing it.
Workflow
- Build a services-zone map by level and identify shafts/risers/plant rooms and major horizontal routes.
- Overlay services with structure, ceilings, facade, partitions, lighting and circulation; prioritize hard constraints and maintenance access.
- Track openings/penetrations and builder-work items with ownership/status.
- Resolve clashes through explicit option tradeoffs and record engineer-approved decisions.
Deliverables
- MEP spatial allowance matrix
- Shaft/plant/ceiling-zone coordination diagrams
- Penetration/builder-work register
- Clash/decision log
Verification
- Vertical risers align, equipment access is preserved and coordination changes propagate to plans/sections/RCPs.
- No airflow, electrical, hydraulic or fire-protection performance is assumed without engineer evidence.
For file/model changes, compare the result against a pre-change baseline and report changed items, skipped items, failures, and checks actually run.
Professional boundaries
- Do not perform final MEP design or certify system performance.
- Maintainability, commissioning and life-safety requirements need discipline review.
If a live CAD/BIM/GIS/analysis tool or MCP integration is available, inspect the current document/model and tool version before write operations. Prefer read-only inspection, dry runs, bounded samples, new output paths, and native undo/transaction mechanisms. Never claim a model or drawing was changed unless the tool confirms it.
If the native application is unavailable, produce a reproducible plan, script, structured data, SVG/DXF artifact, or exact in-application procedure instead of pretending to have operated the software.