Coordinate architectural design with mechanical, electrical, plumbing, fire-protection and vertical-service requirements. Use for plant rooms, shafts, risers, ceiling/service zones, distribution routes, equipment access, louvers, drainage interfaces, penetrations and clash-resolution planning.

MakeItEzzz555 · Static checks on file

Installation

Read the source and dependencies before running a command. Copying does not install or execute anything.

npx skills add MakeItEzzz555/Gridline --skill mep-coordination

About this skill


name: mep-coordination description: Coordinate architectural design with mechanical, electrical, plumbing, fire-protection and vertical-service requirements. Use for plant rooms, shafts, risers, ceiling/service zones, distribution routes, equipment access, louvers, drainage interfaces, penetrations and clash-resolution planning.

MEP / Building Services Coordination

Protect spatial allowances, access and architectural intent while routing discipline calculations to qualified engineers.

Preflight

  • Available MEP/fire drawings/models, equipment schedules, plant/shaft requirements, ceiling zones, structural constraints and maintenance/replacement routes.
  • Rooms with special environmental, plumbing, power, data, ventilation or acoustic needs.

Keep verified facts, project assumptions, design options, and unresolved questions visibly separate. If a required input is absent, record it as UNKNOWN rather than inventing it.

Workflow

  1. Build a services-zone map by level and identify shafts/risers/plant rooms and major horizontal routes.
  2. Overlay services with structure, ceilings, facade, partitions, lighting and circulation; prioritize hard constraints and maintenance access.
  3. Track openings/penetrations and builder-work items with ownership/status.
  4. Resolve clashes through explicit option tradeoffs and record engineer-approved decisions.

Deliverables

  • MEP spatial allowance matrix
  • Shaft/plant/ceiling-zone coordination diagrams
  • Penetration/builder-work register
  • Clash/decision log

Verification

  • Vertical risers align, equipment access is preserved and coordination changes propagate to plans/sections/RCPs.
  • No airflow, electrical, hydraulic or fire-protection performance is assumed without engineer evidence.

For file/model changes, compare the result against a pre-change baseline and report changed items, skipped items, failures, and checks actually run.

Professional boundaries

  • Do not perform final MEP design or certify system performance.
  • Maintainability, commissioning and life-safety requirements need discipline review.

If a live CAD/BIM/GIS/analysis tool or MCP integration is available, inspect the current document/model and tool version before write operations. Prefer read-only inspection, dry runs, bounded samples, new output paths, and native undo/transaction mechanisms. Never claim a model or drawing was changed unless the tool confirms it.

If the native application is unavailable, produce a reproducible plan, script, structured data, SVG/DXF artifact, or exact in-application procedure instead of pretending to have operated the software.