Reverse-lookup glossary that turns a vague description of a web animation or motion effect into its exact term ("the bouncy thing when a popover opens" → Pop in; "the iOS rubber-band scroll" → Rubber-banding). Use when the user asks "what's it called when…", or describes a motion effect without knowing its name and wants the right word to prompt an AI or designer with. For naming an effect, not designing or building one.
Direktori skill
Temukan skill yang dapat digunakan kembali untuk AI agents.
Setiap rekomendasi tetap terhubung dengan repositori, audit, dan jalur pemasangannya.
Hasil pencarian: critical-path-method
Direktori bahasa InggrisReact and Next.js performance guidance for writing, reviewing, and refactoring production UI code.
A versatile command-line tool for interacting with Google Workspace APIs, designed for both human users and AI agents.
Distributed reliable key-value store for the most critical data of a distributed system
Event Driven Orchestration & Scheduling Platform for Mission Critical Applications
Apple's approach to interface design and fluid, physical motion, translated for the web. Use when building or reviewing gesture-driven UI, spring animations, drag/swipe/sheet interactions, momentum and interruptible transitions, translucent materials and depth, typography (optical sizing, tracking, leading), reduced-motion, or the design foundations (feedback, spatial consistency, restraint) behind Apple-style interfaces.
A roadmap to learn Kubernetes from scratch (Beginner to Advanced level)
Reviews animation and motion code against a high craft bar derived from Emil Kowalski's design engineering philosophy. Default to flagging; approval is earned.
This skill encodes Emil Kowalski's philosophy on UI polish, component design, animation decisions, and the invisible details that make software feel great.
YugabyteDB - the cloud native distributed SQL database for mission-critical applications.
28 eval-informed mental models and critical-thinking skills for Claude Code, GitHub Copilot, Codex, Cursor, and other Agent Skills-compatible tools
Vendor-agnostic orchestration for training, inference and agentic workloads across NVIDIA, AMD, TPU, and Tenstorrent on clouds, Kubernetes, and bare metal.